Certificate of Occupancy in Massachusetts
Required before opening a physical location to verify the building meets local code for the proposed use. Issued by the local building department after inspection. Often a prerequisite for many other licenses.
Processing time
2-8 weeks
Typical fee
$100-500
Verified
4/1/2026
Who typically needs this in Massachusetts
- Any business with a physical storefront
- Office tenants in commercial buildings
- Industrial or warehouse operations
Licensing rules change. Confirm current requirements with the issuing authority in Massachusetts before submitting any application. The figures above are typical ranges, not guaranteed quotes.

